Implementation of SCADA in water treatment plant for Abengoa

Puesta en marcha del SCADA en una planta de tratamiento de agua en chile

Company

Abengoa, a Spanish multinational specializing in infrastructure, energy, and water, with a global presence and strategic projects in water treatment, renewable energy, and industrial engineering.

Challenge

Complete the commissioning of a water treatment plant in Chile, implementing a Schneider SCADA system to monitor metrics and the plant's operating status.

Adapt and modify the PLCs and SCADA to ensure reliable and complete operation.

Problem

  • The main supplier, Schneider, did not complete the commissioning or the necessary adaptations.
  • The plant required a fully operational SCADA system synchronized with the existing PLCs.
  • Need to ensure accurate monitoring of critical metrics and secure control of the plant.
  • The project needed to meet commissioning deadlines and ensure the operational reliability of the facility.

 

Solution

How we do it?

Surcontrol was subcontracted to complete the implementation:

  • Modifications were made to the PLCs to fully integrate them with Schneider's SCADA.
  • The SCADA configuration and customization were completed, enabling real-time monitoring of all critical plant metrics.
  • Functional tests, parameter adjustments, and validation of alarms and control systems were performed.
  • The system was ensured to meet operational, safety, and reliability standards, successfully completing the plant's commissioning.

Results

  • Fully operational water treatment plant monitored by SCADA.
  • Complete integration of PLCs and monitoring software.
  • Improved management of critical metrics and plant status.
  • Compliance with commissioning deadlines and safe operation.
  • Robust and reliable solution that guarantees efficiency and operational continuity at the plant.